Last edited by Kazitaur
Monday, July 27, 2020 | History

5 edition of Contract documents and specifications: demolition and site clearance, contract no. 6 (Clinton market building) of downtown waterfront - Faneuil Hall project no. Mass. R-77, downtown north district, city of Boston, Massachusetts. found in the catalog.

Contract documents and specifications: demolition and site clearance, contract no. 6 (Clinton market building) of downtown waterfront - Faneuil Hall project no. Mass. R-77, downtown north district, city of Boston, Massachusetts.

by Boston Redevelopment Authority

  • 381 Want to read
  • 1 Currently reading

Published .
Written in English

    Subjects:
  • Buildings -- Massachusetts -- Boston -- Downtown.,
  • Clinton Market Building, Boston (Mass.),
  • Downtown, Boston (Mass.) -- Demolition.,
  • Faneuil Hall Urban Renewal Area, Boston (Mass.) -- Demolition.,
  • Urban renewal -- Massachusetts -- Boston -- Downtown.,
  • Waterfronts -- Massachusetts -- Boston -- Downtown -- Urban Renewal.

  • About the Edition

    ...includes instructions and forms, general specifications, general conditions, instructions to bidders; this item was in the BRA collection...

    The Physical Object
    Pagination76 p.; tables
    Number of Pages76
    ID Numbers
    Open LibraryOL23290912M

    A FIDIC standard Contract for civil engineering (Red Book 4th Edition ) is basis of a Contract for a Wharf and Approach Bridge Construction and Causeway Reclamation project (The Contrac). The Contract is a Lumpsum Agreement and the BOQ refers as follows: All works in this section except Provisional Quantities will be paid for as LumpSums. The document is the mandatory language for goods and services bid specifications and contracts pursuant to N.J.A.C. , and the mandatory bid specification and contract language for employment goal compliance for goods and services at N.J.A.C. A complete review of both rule provisions is recommended.

    general site clearance, demolition of existing structures and site grading works and includes following. 1) Obtain approvals from all relevant Authorities for site clearance and grading works 2) Physical site survey to assess number of existing structures (Please note that some of the structures are below ground) and other items. City of Norwich Code of Ethics 6 Contract Documents City of Norwich – Contract for Services 9 Performance and Payment Bonds 4 Specifications Summary of the Work 2 Demolition 1 Asbestos Abatement 3 the site. Demolition contractors must hold .

    TxDOT has established standards and specifications for the construction and maintenance of highways, streets and bridges. Below are links to documents and important information for contractors and professional service providers. Standard Specifications Book — Also available for purchase in two sizes: 6 x 9 in.; x 11 in. contract award processes (such as comprehensiveness of project documents, proper planning, choice of contract, appropriateness and quality of Procurement Documents, evaluation of bids/proposals etc.) all contribute to the success of a contract. The Bank has other guidance in place to support Borrowers in the pre-contract award processes.


Share this book
You might also like
The nature of man

The nature of man

Punch & Judy, a history.

Punch & Judy, a history.

Paul Erdmans money guide

Paul Erdmans money guide

Amethyst Deposits of Ontario.

Amethyst Deposits of Ontario.

showman of Vanity Fair

showman of Vanity Fair

Organic molecules in action

Organic molecules in action

uses of Marx

uses of Marx

To raise the standard of food distribution research

To raise the standard of food distribution research

Cézanne

Cézanne

bonny Earl of Murray

bonny Earl of Murray

The Construction of Reality in the Child

The Construction of Reality in the Child

Office systems and procedures

Office systems and procedures

[IRS e-file marketing toolkit supplement.]

[IRS e-file marketing toolkit supplement.]

Contract documents and specifications: demolition and site clearance, contract no. 6 (Clinton market building) of downtown waterfront - Faneuil Hall project no. Mass. R-77, downtown north district, city of Boston, Massachusetts by Boston Redevelopment Authority Download PDF EPUB FB2

Contract for building demolition and site clearance services city of guthrie city hall, n 2nd st, guthrie, oklahoma Document Meta Data Filed: May 15th, ASBESTOS ABATEMENT, DEMOLITION, SITE CLEARANCE, BACKFILL, AND GRADING OF FORTY- ONE (41) VACANT DWELLINGS/STRUCTURES CONTRACT NO.

RD In the City of Youngstown, Mahoning County, Ohio, the Director of Finance will receive sealed bids for the above referenced project until noon, Eastern Standard Time on. Thursday, July 2, Part 4 – DEMOLITION AND SITE CLEARANCE SPECIFICATIONS. DEFINITIONS within the book forming these documents.

CONTRACT PERFORMANCE – The act of complying with these contract and 3 of these documents. SPECIFICATIONS – SPECIAL – Refers to special information items pertinent to. Performance/Payment Bond (O.R.C.

Section ) contained in the contract documents, with a surety company executing the bond. The surety company must be listed on the Treasury Department’s most current list (Circular as amended), and must be authorized to transact business in.

Although blueprints and certain documents can illustrate what a building should look like visually, an in-depth written explanation is needed to describe the construction process. Simply put, construction specifications are documents prepared ahead of construction to describe how building should be carried out by contractors and subcontractors.

Description: CONTRACT TAB B/ D - STRUCTURAL STEEL REPAIRS TO TWO BRIDGES AT MP AND AND VERTICAL CLEARANCE IMPROVEMENTS AT MP IN ERIE AND CHAUTAUQUA COUNTIES IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. Contract Documents: Proposal Book 1 Of 1; Plans Volume 1 Of 1; Supplemental Information:.

Insurance document submission for INDOT construction contracts is now fully electronic, as of July 1, INDOT will no longer accept paper submissions. Insurance documents required at the time of contract award should be submitted as per the instructions in the award letter. Subpart - Publicizing Multi-Agency Use Contracts: Subpart - Publicizing Requirements Under the American Recovery and Reinvestment Act of Part 6 - Competition Requirements: Subpart - Full and Open Competition: Subpart - Full and Open Competition After Exclusion of Sources: Subpart - Other Than Full and Open Competition.

Representation >> Codes / Specs / Contracts MasterFormat Specification Divisions (CURRENT) The Construction Specifications Institute (CSI) publishes the MasterFormat, which is the standard that is used most often for formatting 02 40 00 ­ Demolition and Structure Moving 02 50 00 ­ Site Remediation.

12/5/13 MasterFormat Specification. Unfortunately, CSI no longer makes the list available for free. MasterFormat Divisions MasterFormat was first released in and only had 16 Divisions until the new Division MasterFormat was released in late DEMOLITION AND SITE CLEARANCE GENERAL SPECIFICATIONS ( REVISION)) Parcel 1 –– North 13th Street – story frame 1-family dwelling & 1-story frame shed Remove dwelling and shed, fences, garage slab, sidewalks, concrete steps, trees, bushes and shrubs, driveway and approach and one curb cut.

Developmental Specifications are requested from the District Specifications Office on a project by project basis. Push Button: Push Button Specifications allow the use of Work Documents or Task Orders to complete the work covered by the contract.

Maintenance: Specifications developed for use on Maintenance Contracts. A Guide to Construction Contracts 5 What is a contract. Construction contracts A contract is an agreement entered into between two or more people with the intention of creating legally enforceable obligations. Once properly concluded, a contract is binding on each party.

This means that each party has a legal obligation to do the things which the. Other Licences For other licences not specified under Clause but are required by a relevant Regulatory Authority (such as licence to carry out high risk work), comply with the licensing requirements of that Authority.

PERSONNEL Demolition Site Supervisor. Contract period 90 months in total includes 7 contract years (6 months mobilisation then eighty-four 84 months operation) plus optional 36 months. PP's should note that the start and completion dates at 'II Duration of the Contract or Time-limit for Completion' below are set to align with the current contract end dates which may be subject.

contract documents and the roles and relationships of the participants in the process. This introduction contains specific information on the use of the NIBS Guide Specifications for assembling a comprehensive set of contract documents for asbestos abatement in buildings.

The information is expected to be helpful for. NYC DOT Standard Specifications, February Volume II. Highway Addendum No. 1, October ; NYC DOT Standard Specifications, November Volume I; NYC DOT Standard Specifications, November Volume II.

Highway Addendum No. 1, February ; Highway Addendum No. 1, May ; Sewer and Water Main. Standard Sewer Specifications, August. Office and Site Improvements DFM Project No.: MJ Contract No.: FW Date of Issue: June 5, Notice No.

1: Attach this addendum to the Project Manual for this project. It modifies and becomes part of the Bidding Documents. Work or material not specifically mentioned herin is to be as described in the main body of the. contracts. These specifications are written to the Contractor.

They define the Contractor’s notes or special specifications or documents of any description that would be furnished as part of a construction contract. demolition debris, shall not be disposed of by burning on or off the site. Off site. Manual of Contract Documents for Highway Works Volume 1 - Specification for Highway Works.

Document Number Document Name; March Amendment; Series Introduction: Series Preliminaries: Series Site Clearance: Series Fencing: Series Road Restraint System (Vehicle and Pedestrian) Series Drainage and Service.

and specifications. Applicant electric service and meter installation arrangements are subject to Con Edisons review and approval. Applicants should submit a Work Request as soon in the planning process as possible. This document and the information contained within is referenced and compliant with CI and New York Public Service Law.2 U.S.

DEPARTMENT OF LABOR PREVAILING WAGE RESOURCE BOOK DB WAGE DETERMINATIONS PHYSICAL INCLUSION OF WAGE DETERMINATION(S) IN BID SPECIFICATIONS AND CONTRACT DOL regulations, at 29 C.F.R. Part 1, establish the procedures for predetermining the wage rates required to be included in bid specifications/contracts for construction projects to which .DEMOLITION AND SITE CLEARANCE GENERAL SPECIFICATIONS ( REVISION)) Parcel 1 –– A North 19th Street – 2-story frame 2-family dwelling Remove dwelling, fences, sidewalks, concrete steps, trees, bushes and shrubs.

Contractor shall be responsible for removal of all tree stumps on this parcel as part of the demolition.